JUST IN TIME
Logistics and Precision for a Century-Defining Infrastructure Project
The Brenner Base Tunnel is one of the most demanding infrastructure projects in Europe. A key factor in the successful tunnel excavation for construction lot ARGE H53 is the seamless supply of high-precision precast concrete tunnel segments.
This production film documents the logistical achievement of the Max Bögl Group. From the state-of-the-art manufacturing of massive tunnel segments at the Sengenthal plant to the daily, precisely timed just-in-time delivery directly into the Alps.
The execution: Our task was to visually bridge the gap between stationary industrial production and the harsh reality of the construction site. With only 1.5 days for the entire shoot, we operated with maximum efficiency: using dynamic drone flights and close-up shots of the manufacturing processes, we translated the immense scale and the perfectly synchronized supply chain into an immersive experience. The film reveals not just concrete and machinery, but the logistical clockwork that makes a megaproject of this scale possible in the first place.
Client: Max Bögl Group
Format: Production & Logistics Film
Industry: Concrete Processing /
Tunnel Segments Manufacturing
Location: Sengenthal (DE) & Tyrol (AT)
Direction: Schnittraum
Postproduction: Schnittraum
Cinematography: Schnittraum