Sebastin Dietrich: A Year in the Fast Lane

BBT Lot H53

End-of-year recaps don't have to be rigid. For the construction giant PORR, we created a highly dynamic social media clip summarizing the 2025 milestones of the massive Brenner Base Tunnel (Lot H53) project. Guided by the highly charismatic project manager, Sebastian Dietrich, the film takes viewers on a rapid, engaging tour straight through the heart of the construction site.

The Execution: Time on active mega-construction sites is the most valuable resource. We had exactly one hour to film all interview segments with Sebastian across multiple, vastly spread-out tunnel sections. This required a strict "run and gun" approach. We kept the camera constantly on the move, even shooting parts of the interview while driving between locations.

To make this kinetic, rapid-fire interview style work seamlessly with our existing high-end B-roll, Caro completely adapted the editing pace and overall mood in post-production. The rhythm of the cut matches the speed of the shoot, resulting in a charming, witty, and incredibly varied clip that thrives entirely on the natural sympathy of its protagonist and our agile production style.

Client: PORR

Format: Social Media Recap / End of Year Campaign

Industry: Heavy Construction / Infrastructure

Location: Brenner Base Tunnel (Lot H53), Tyrol

Direction: Schnittraum

Postproduction: Schnittraum

Cinematography: Schnittraum

Previous
Previous

GWM – Factory Meets Sand (Volleyball Campaign)

Next
Next

PORR – Portrait Angelika Schönauer